Copping Advanced Organics Facility, TAS
PROJECT OVERVIEW
Southern Waste Solutions (SWS) is jointly owned by Clarence City, Sorell, Tasman and Kingborough Councils, and services around half of Tasmania’s population across the east coast and south from its Copping and Lutana sites. Councils across the region are moving to food and garden organics (FOGO) collection and landfill capacity is tightening, so SWS is planning an Advanced Organics Facility that would extend the existing Copping precinct into advanced organics processing. The aim is to get processing running as quickly as practical, with room to grow into a broader circular resource precinct.
OREZ SCOPE
SWS selected OREZ through a competitive Expression of Interest to deliver a concept and feasibility study, which began in July 2026 and runs across two Stage Gates. OREZ is acting as an independent, engineering led technical and commercial adviser. The study covers feedstock definition, forecasting and variability modelling using regional kerbside audit data, mass balance and throughput modelling built on OREZ’s in-house methodology, site and infrastructure concept development, an approvals pathway, and delivery model and economic analysis.
TECHNOLOGY
The facility has to handle a varied feedstock mix: kerbside FOGO, garden organics, commercial and industrial organics, and specialist streams such as aquaculture by-products and biosolids. OREZ is comparing in-vessel composting (IVC), covered aerated static pile (CASP) composting and anaerobic digestion (AD) configurations like for like, including staging options. No technology, delivery model or design has been confirmed, the study exists to test what fits SWS’s needs and the region’s feedstocks. The priorities are set in a clear order, landfill diversion first, technical robustness second, and energy recovery as an added benefit. The result is a pathway that extracts more value from regional organics, producing quality soil products with the potential to recover renewable energy.
NEXT PHASE
With Stage Gate 1 complete, the study is moving into Stage Gate 2. It will conclude with a Final Preferred Concept and Feasibility Report and Implementation Roadmap. Together they give the SWS Board a clear, staged plan to support approvals, procurement and investment decisions, starting fast and scaling over time, in line with the Tasmanian Government’s resource recovery priorities.