BACK TO TOP

Providing tailored waste management solutions.

0400 000 000

FOGO Pre-Treatment Line

Project:

FOGO Pre-Treatment Line


Location:

Epping Victoria


Client:

Repurpose It

Orez has deigned and delivered a FOGO pre-treatment process line in Epping Victoria for Repurpose It. The plant is designed to process up to 35 tonnes per hour.

Key inclusions:

  • Komptech electric star screen for efficient screening, adjustable at the touch of a button
  • Twin windsifters for maximum removal of light plastics
  • Generous climate-controlled picking
  • Steinert Eddy current separator for nonferrous metal separation.