Topsoil Organics Bioenergy Facility, NSW

Year:
2026 - Detailed Design Underway
Location:
Forbes, NSW
Client:
Topsoil Organics

Project overview

Topsoil Organics is transforming its Forbes Organic Recycling Facility into one of regional NSW’s most significant bioenergy facilities, with OREZ leading the engineering from concept through to detailed design. The expansion integrates advanced Anaerobic Digestion technology with Topsoil’s established composting operations, creating a facility that converts 60,000 tpa of packaged commercial and industrial food organics into renewable gas, digestate and compost.

Strategically located near existing gas infrastructure, the facility is positioned to produce certified, traceable renewable gas under the Renewable Gas Guarantee of Origin framework, directly addressing the infrastructure gap created by NSW’s July 2026 source separation mandates for large commercial and industrial waste generators.

 OREZ scope

OREZ led the Early Contractor Involvement and FEED phases, delivering the Basis of Design, technology integration, process engineering and delivery strategy that carried the project to Detailed Engineering. That work gives Topsoil Organics the technical and commercial confidence to progress funding, approvals and procurement in parallel, ahead of a targeted Final Investment Decision in approximately Q1 2027.

 Technology

The facility incorporates Thöni’s TNV Wet Digestion Semi-Dry process, engineered for high organic content feedstocks such as packaged C&I food waste. Running at higher dry matter content than conventional wet AD systems, it delivers greater biogas yield per cubic metre of digester capacity and a smaller plant footprint. The design also integrates automated de-packaging at receival, a dedicated pasteurisation unit, and high-capacity digestate storage to optimise output.

 Next phase

OREZ is working alongside Topsoil Organics through Detailed Engineering, with construction expected to follow FID and first gas and fertiliser production targeted for Q4 2028, aligned to the rollout of state and federal renewable gas initiatives.