Tamworth Regional Council brought OREZ in under a staged Design and Construct contract to take a proposed organics processing facility from concept through to detailed design and a fully costed construction price. Where a generalist contractor builds to a brief, OREZ interrogates it, testing the scope against real feedstock volumes, real infrastructure constraints, and real […]
Location Archives
FOGO Screening Line Extension, NSW
Screening Line Extension – Three-Fraction Compost Classification Following the successful delivery of the primary compost screening line, OREZ was subsequently engaged by Soilco to extend the system’s classification capability through the supply and commissioning of an additional screening stage. The extension involved the installation of an M2SE star screen to introduce a third screening “cut,” […]
Clean Energy Compost Manufacturing Facility, NSW
A detailed concept design package for an advanced bioenergy facility. Orez was engaged by Soilco to provide a concept design and preliminary design package for an Anaerobic Digester to capture biogas from Organic waste to generate onsite renewable energy which forms part of their proposed Clean Energy Compost Manufacturing Facility (CECMF). In partnership with Thoeni, […]
FOGO Refining Line, NSW
Soilco engages OREZ to deliver a new Komptech Cribus 3800 drum screen, including design coordination and HAZOP facilitation services. OREZ was engaged by Soilco to deliver a new compost screening solution at its Tweed Heads organics facility, incorporating a Komptech Cribus 3800 drum screen as part of an integrated screening line upgrade. Beyond equipment supply, […]